The pool is designed for a special needs school in Southwark and is to become a resource for the local community.

The pool is located on the site of a disused building on the school campus. The pool is covered by a ply box beam canopy roof. Light penetrates through slots within the canopy to the pool below as sun light filters through the trees.

The pool is a positive gesture to enable regeneration and links the school to others in the locality.